atlas/tickets/backlog/TICKET-037_calendar-integration.md
ilia 7c633a02ed Initialize project structure with essential files and documentation
- Added .cursorrules for project guidelines and context
- Created README.md for project overview and goals
- Established ARCHITECTURE.md for architectural documentation
- Set up tickets directory with initial ticket management files
- Included .gitignore to manage ignored files and directories

This commit lays the foundation for the Atlas project, ensuring a clear structure for development and collaboration.
2026-01-05 20:09:44 -05:00

1.3 KiB

Ticket: Calendar Integration (Optional)

Ticket Information

  • ID: TICKET-037
  • Title: Calendar Integration (Optional)
  • Type: Feature
  • Priority: Low
  • Status: Backlog
  • Track: Tools/MCP
  • Milestone: Milestone 4 - Optional Integrations
  • Created: 2024-01-XX

Description

Implement calendar tools (optional, after MVP):

  • Tools: list_events, create_event, modify_event
  • Explicit confirmation required
  • Calendar API integration (Google Calendar, CalDAV, etc.)
  • Read-only and write operations

Acceptance Criteria

  • Calendar tools implemented
  • list_events working
  • create_event with confirmation
  • modify_event with confirmation
  • Confirmation flow enforced
  • Tools registered in MCP server

Technical Details

Implementation:

  • Google Calendar API or CalDAV
  • OAuth authentication
  • Confirmation: require explicit approval for create/modify

Tools:

  • list_events: List upcoming events
  • create_event: Create (with confirmation)
  • modify_event: Update (with confirmation)
  • delete_event: Delete (with confirmation)

Dependencies

  • TICKET-045 (confirmation flows)
  • TICKET-029 (MCP server)
  • Strong safety design
  • home-voice-agent/mcp-server/tools/calendar/ (to be created)

Notes

High-risk tool. Requires strong confirmation flow. Do after MVP.